Altin Hydropower Station, Canada 

Turbine Configuration

Type of Turbine

Type of Generator

Capacity (kW)

D. H (m)

Horizontal Pelton

2CJA237-W-130/2×15.2

SFW2000-24/2600

2000

9131m


Check here to download:
         1、Turbine Generator Package Shop Test Report-Atlin Hydro Project
         2、Customer reference letter

Brief Introduction:

Atlin hydropower project is located at Surprise Lake, Atlin Town, British Columbia, Canada.

The hydroelectric project is designed to deliver the sufficient energy from Surprise Lake flow to the BC Hydro's local grid system without support from diesel generator station with its nominal water head as 91.31m.

The nominal installed capacity of the project is 2.0MW.

Technical Liaison Meeting of Atlin Hydropower Station, Canada The Pre-assembly Testing and  Adjusting of Turbine Generator Unit
The Pre-assembly Testing and  Adjusting of Turbine Generator Unit UT Examination for Wheel Rib of Runner
Penetration Test(PT )for Runner PT Imaging for Runner
The AC Withstand Voltage Test for Rotor Tria Run Test for Generator
发表日期:2009年2月3日 -作者:SuperUser Account
Copyright 2002-2012  Chongqing Yunhe Hydropower Inc.   Tel:86-23-68950222    
Add: Xinke International Plaza, 11-12F, Building C, Jinyu Avenue #68, New North Zone, Chongqing, China
E-mail:itd3@cqyunhe.com  Yu-ICP:05006832   Technical Support :