|
Mugica Hydropower Station,Mexico
|
|
Mugica Hydropower Station,Mexico |
|
project is very important to the region, since the main purpose of the dam is for agricultural irrigation. Equipment being supplied includes a single horizontal Francis turbine and associated generator, instrumentation, hydraulic power unit (for the governor and the butterfly valve), lubrication system, butterfly valve, dismantling joint, medium-voltage switchgear, low-voltage switchgear, transformers, control system (AC800M/S800 and PGP), protection system (REG670), and all accessories and services necessary to operate the system.
Chongqing Yunhe Hydropower Inc. is executing the project as part of a strategic alliance with ABB , one of the world' s leading electric equipment supplier in the market. | |
|
发表日期:2011年5月4日 -作者:SuperUser Account
|